Apartment description
A NEW DETAIL where a total of 42 apartments will be completed. 14 46.0-50.0 m² duplexes, 21 56.0-72.5 m² triangles and 7 88.0 m² squares. Estimated completion of the apartments is September 30, 2025.
The first application period is 23.10.-6.11.2024, after which there is a continuous search for the destination.
The prices shown in the advertisement are starting prices and the prices of apartments of the same size vary from floor to floor. When filling out the application, you must select the “New destination” button as active and select “Urheilutie 41” as the desired destination.
Corner apartment in the north corner of the house. This home has its own sauna, so you can enjoy the sauna whenever you want. A unified kitchen space/living room brings space and allows you to decorate as you wish. From the living room there is access to the glazed balcony, which is located on the northwest side of the house.
Information about the property where the apartment is located
New right-of-occupancy apartments are being built in the center of Vaajakoski, at Urheilutie 41. Central location at the corner of Urheilutie and Vesmannintie: all services in the center of Vaajakoski are easily accessible, e.g. grocery stores, a swimming pool, a sports area, a library and a health center are located just a stone’s throw away. Schools and the nearest kindergartens are also within walking distance. The journey to the center of Jyväskylä (approx. 7 km) takes about 10 minutes by car.
A total of 42 right-of-occupancy apartments will be completed in this apartment building, with suitable options for singles, couples and families. The sizes of the apartments vary between 46 and 88 m². Most of the apartments have their own sauna and glazed balcony. The smallest two-room apartments have no sauna and are equipped with a French balcony.
There will be a total of 27 parking spaces at the destination, of which one space is reserved for a shared car. Some of the parking spaces are covered and some are open.
Apartment types:
2h+kt, 46.0 m² (7 units)
2h+kt+s, 50.0 m² (7 units)
3h+kt+s, 56-72.5 m² (21 pcs)
4h+kt+s, 88.0 m² (7 units)
Estimated date of completion is 30 September 2025.
The first application period is 23.10.-6.11.2024, after which there is a continuous search for the destination.
The general value added tax rate will rise from 24% to 25.5% from September 1, 2024. In a state-subsidized right-of-occupancy building, a maximum of 15 percent of the construction or acquisition costs (purchase value) approved by the Housing Finance and Development Center can be collected as right-of-occupancy fees. The Housing Finance and Development Center has approved the construction costs of the site with a tax rate of 24 percent. If the construction costs of the right-of-occupancy project increase due to an increase in the value-added tax rate, the right-of-occupancy fees may have to be revised, however less than 1.5%. Possible revisions of right-of-occupancy fees will be made after the object is completed. Holders of the right of residence will be informed in writing about the revision of right-of-occupancy fees.