Apartment description
Inquiries can primarily be submitted by email to the sales negotiator: nina.haataja@ta.fi. Newly renovated 4th-floor two-room apartment with sauna in a central location close to the city center’s services immediately available. Living comfort is increased by a private sauna and a south-facing balcony. The kitchen has space for a dishwasher. The apartment has been renovated by KPH + S in the summer of 2022 and at the same time a laminate floor has been installed in the apartment. The bathrooms and saunas of other apartments in the property are still being renovated until the end of 2022. In addition, the kitchen will be renovated in the apartment during 2023. The apartment is available immediately and reception no later than September 6, 2024. You apply for an apartment by filling out an electronic rental apartment application (https://ta.fi/vuokrahekemis) or by filling in and printing the application form (http://ta.fi/images/pdf/vuokra_yleish.pdf). The application can also be scanned as an e-mail attachment. Applicants’ credit information is checked. An apartment can be offered to those who submitted their application, and after receiving the offer, you can view the apartment.
Information about the property where the apartment is located
Apartment building with elevator, completed in 1997, in a quiet but central location on the shores of Lake Iidesjärvi in Järvensivu, Tampere. There is a daycare center in the courtyard of the house. Elementary and middle school and the university are within walking distance. The versatile services of the center of Tampere are only 1.5 kilometers away. Good public transport connections. Nearby, a popular outdoor trail around Iidesjärvi.
The site has both outdoor spaces with heating plugs and garage spaces.
The apartment-specific warm movable storages as well as general outdoor equipment storages and a drying room are located on the ground floor of the building.
Washrooms and bathrooms have been renovated in every apartment in 2021-2022.
Kitchen renovations have been completed throughout the property in 2023-2024.